WASHINGTON, DC 20002 · DC — Ward 5
Building permit — miscellaneous
AH permit for Indigenous Peoples Day (10/12/2026) and Veterans Day (11/11/2026). Rehabilitation of the exterior facade of the structure and replacement of the roof, windows, and entry doors.
Applicant: LILLY HOCHHAUSER · Owner: DISTRICT OF COLUMBIA
Building permit — variance
We request acceptance of the 50 psf current live load capacity of the existing floor structure in the historic Crummell School, listed on the National Register of Historic Places, which is being renovated for use as a Community Center by DGS and DPR. Section 1206 of Chapter 12 of the ICC Existing Building Code allows for the following Exception: "The code official shall be authorized to accept existing floors and approve operational controls that limit live load on any such floor."
Applicant: ROBERT ALLEN · Owner: DISTRICT OF COLUMBIA, DGS
Building permit — civil plans
This project phase includes demolition of the Crummel Community Center surface parking lot and rough grading for future development.
Applicant: LILLY HOCHHAUSER · Owner: DISTRICT OF COLUMBIA
Building permit — alteration and repair
Rehabilitation of exterior facade of structure, and replacement of roof, windows, and entry doors
Applicant: LILLY HOCHHAUSER · Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.