WASHINGTON, DC 20036 · DC — Ward 2
Building permit — electrical
Owner: 1900 M L L C
Building permit — plumbing and gas
Owner: 1900 M L L C
Building permit — plumbing and gas
Owner: 1900 M L L C
Building permit — electrical
Owner: 1900 M L L C
Building permit — alteration and repair
INTERIOR RENOVATION TO 3RD FLOOR ELEVATOR LOBBY AND BUILD OUT OF BUILDING CORRIDOR. PARTITIONS, FINISHES, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO STRUCTURAL. NO PLUMBING. 752 SQUARE FEET. FAST TRACK REVIEW REQUEST.
Applicant: SAM HOLLEN · Owner: 1900 M L L C
Building permit — electrical
Owner: 1900 M L L C
Building permit — alteration and repair
INTERIOR RENOVATION TO 4TH FLOOR LOBBY AND BUILDOUT OF PUBLIC CORRIDOR. PARTITIONS, FIXTURES, FINISHES, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING. NO STRUCTURAL. 720 SQUARE FEET. ACCELERATED PLAN REVIEW REQUEST.
Applicant: SAM HOLLEN · Owner: 1900 M L L C
Building permit — sign
Erect storefront sign for JUST SALAD
Applicant: JOHN PFEIFFER · Owner: 1900 M L L C
Building permit — miscellaneous
REMOVAL OF EXISTING INTERCONNECTING STAIR BETWEEN 3RD AND 4TH FLOORS. SLAB INFILL ON 4TH FLOOR. SCOPE INCLUDES STRUCTURAL WORK. FLOORS ARE AND WILL REMAIN IN SHELL CONDITION. FLOORS ARE UNOCCUPIED AND WILL REMAIN SO UNTIL A FUTURE TENANT BUILD-OUT OCCURS UNDER A SEPARATE PERMIT
Applicant: JAMES MAXWELL · Owner: 1900 M L L C
Building permit — electrical
Owner: 1900 M L L C
Building permit — sign
New non-illuminated sign "Great Many"
Applicant: ELIZABETH MARTINEZ · Owner: 1900 M L L C
Building permit — alteration and repair
REMOVAL OF EXISTING INTERCONNECTING STAIR BETWEEN 3RD AND 4TH FLOORS. SLAB INFILL ON 4TH FLOOR. SCOPE INCLUDES STRUCTURAL WORK. FLOORS ARE AND WILL REMAIN IN SHELL CONDITION. FLOORS ARE UNOCCUPIED AND WILL REMAIN SO UNTIL A FUTURE TENANT BUILD-OUT OCCURS UNDER A SEPARATE PERMIT.
Applicant: ELIZABETH FROST · Owner: 1900 M L L C
Building permit — miscellaneous
Daily and Holiday work being preformed
Applicant: JANICE MILLAR MARUT · Owner: 1900 M L L C
Building permit — plumbing and gas
Owner: 1900 M L L C
Building permit — mechanical
Owner: 1900 M L L C
Building permit — miscellaneous
Daily and Holiday work being preformed
Applicant: JANICE MILLAR MARUT · Owner: 1900 M L L C
Building permit — electrical
Owner: 1900 M L L C
Building permit — plumbing and gas
Owner: 1900 M L L C
Building permit — alteration and repair
INTERIOR TENANT IMPROVEMENT FOR A NEW HAIR GROWTH STUDIO IN AN EXISTING WHITE BOX TENANT SPACE. WORK TO INCLUDE CARPENTRY & MEP TRADES - AREA AFFECTED 2575 SF
Applicant: CHRIS VU / THUY LE · Owner: 1900 M L L C - GREAT MANY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.