WASHINGTON, DC 20009 · DC — Ward 1
Building permit — alteration and repair
Historic Replacement of a non-structural lower-level slab-on-grade floor in existing apartment (replace existing). Work includes subgrade preparation, replacement of stone base with a vapor barrier and pouring a 4" concrete floor slab with wire mesh. No underpinning or structural alterations.
Applicant: KEVIN PYNE · Owner: PYNE, KEVIN
Building permit — alteration and repair
HISTORIC Demolition of 40 ft. of drywall, demo of bathroom, and kitchen area.
Applicant: PYNE, KEVIN · Owner: LAVELLE, KATHLEEN
Building permit — permit
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.