WASHINGTON, DC 20020 · DC — Ward 8
Building permit — miscellaneous
In the Anacostia Historic District Drilling 1 closed loop geothermal well at 800 feet.
Applicant: DONNA PEREZ · Owner: DISTRICT OF COLUMBIA
Building permit — demolition
HISTORIC SCOPE OF WORK INCLUDES FULL DEMOLITION OF EXISTING 1960s BUILDING WING; DOORS; WINDOWS; AND PARTIAL INTERIOR DEMOLITION OF 1940s AND 1908 WINGS, INCLUDING ELECTRICAL, MECHANICAL, AND PLUMBING SYSTEMS; INTERIOR PARTITIONS, AND FINISHES U.N.O. PARTIAL DEMOLITION OF SELECT EXISTING EXTERIOR AND BEARING WALLS IS ALSO INCLUDED. PROJECT SCOPE FOR RENOVATION AND NEW CONSTRUCTION WILL BE INCLUDED IN A FUTURE BUILDING PERMIT SUBMISSION.
Applicant: DFM PERMITS · Owner: DISTRICT OF COLUMBIA
Building permit — civil plans
In the Anacostia Historic District Ketcham Elementary - Installation of erosion and sediment controls for the partial demolition phase of the project. FOR EROSION AND SEDIMENT CONTROLS INSTALLATION ONLY. SEPARATE PERMIT REQUIRED FOR ALL DEMOLITIONS ON SITE.
Applicant: DFM PERMITS · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
We propose to perform two (2) soil borings to maximum depths of 40 feet below existing grades or refusal, whichever occurs first. The borings will be advanced using a geotechnical drill rig which utilizes 3.25-inch hollow stem augers. Upon completion, the borings will be backfilled with a bentonite slurry in general accordance with DOEE requirements.
Applicant: BRYCE M BROWN · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
HISTORIC Drilling 1 test well at 380 feet. 1 test well only. Geothermal wells under separate application.
Applicant: DONNA PEREZ · Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.