WASHINGTON, DC 20003 · DC — Ward 6
Building permit — electrical
Owner: CRESCENT CAPITOL VIEW MF LLC
Building permit — mechanical
Mechanical trade Permit
Applicant: DOMINIC TOTARO · Owner: CRESCENT CAPITOL VIEW MF LLC
Building permit — alteration and repair
Replace existing mechanical HVAC systems serving the space with new equipment and associated distribution. Work includes relocating condenser units to the open-air loading dock and installing the units in a 3 x 2 arrangement along the loading dock wall. Replace associated ductwork and air distribution devices (diffusers/grilles) as required to match the new equipment. Provide all associated electrical work required for the new mechanical equipment, including feeders/branch circuits, disconnects, and related power connections per the electrical plans. Existing space use to remain unchanged; ventilation and exhaust intent to remain the same as existing. All work to be performed in accordance with the 2017 DC Construction Codes and the signed/sealed discipline drawings.
Applicant: RAUSHAN MURSHID · Owner: CRESCENT CAPITOL VIEW MF LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.