GAITHERSBURG, MD, 20877 · Montgomery County
Building permit — commercial building
Scope of work includes replacing existing underground chilled water piping between mechanical room and chillers with aboveground piping.
Building permit — commercial building
We are removing ducts and installing new ducts for a one fan coil unit. This will match the new layout provided by the architect. We will also be moving a fan coil unit 5 feet and reconnecting to the existing condenser and chilled water lines. We will add one exhaust fan and a fan coil providing 600 cfm's additional for a class room.
Building permit — commercial building
Revision,1 - Exist. bearing wall required plan revisions and lintel details.Customer Wants To Use ePlansCustomer Wants To Use ePlans,Interior alteration of existing classrooms and offices into a suite of classrooms, offices, and support spaces to serve the Bridge program.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.