WASHINGTON, DC 20060 · DC — Ward 1
Building permit — electrical
Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — mechanical
Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — miscellaneous
In the LeDroit Park Historic District Verizon Wireless proposes install 4 antennas on an existing rooftop and upgrade ancillary equipment as per plans
Applicant: NB+C LLC · Owner: HOWARD UNIVERSITY
Building permit — miscellaneous
HISTORIC Entirely on private property to provide covered walkway scaffold to emergency department entrance. Only one (1) Story tall.
Applicant: DAVID FONTANA · Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — plumbing and gas
Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — miscellaneous
n the LeDroit Park Historic District Abandon 3 monitoring wells
Applicant: ZOE L VULGAROPULOS · Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — miscellaneous
HISTORIC Mobilize drill rig to install three monitoring wells
Applicant: ZOE L VULGAROPULOS · Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — civil plans
RELOCATE THE EXISTING SERVICE UTILITIES, LOCATED WITHIN THE PROPOSED HOSPITAL BUILDING FOOTPRINT, CURRENTLY SERVICING THE EXISTING HOSPITAL BUILDING. REMOVE EXISTING UTILITIES AS NEEDED TO GET SPACE FOR UTILITIES RELOCATION. THE EXISTING HOSPITAL SHALL REMAIN OPERATIONAL DURING UTILITIES RELOCATION. REMOVE OR ABANDON EXISTING UTILITIES AS SHOWN ON THIS PLAN PACKAGE.
Applicant: DAVID T FONTANA · Owner: HOWARD UNIVERSITY (LAND ONLY)
Building permit — miscellaneous
HISTORIC Abandon one monitoring well
Applicant: ZOE L VULGAROPULOS · Owner: HOWARD UNIVERSITY (LAND ONLY)
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.