20511 SENECA MEADOWS PKWY

GERMANTOWN, MD, 20876 · Montgomery County

Permit activity

Jul 2026 → Aug 2026
  1. Building permit appliedJul 14
  2. Building permit appliedAug 3
  3. Building permit issuedAug 7
MC-1164813
Issued

Building permitcommercial building

445' OF 6' HIGH CHAIN LINK FENCE AND (3) 24' WIDE DOUBLE SWING GATES.

Issued Aug 7, 2026
Filed Jul 14, 2026
MC-1166967
Open

Building permitcommercial building

Interior work only,THIS PROJECT WILL BE SPLIT INTO 4 DIFFERENT PHASES OF PERMITTED DRAWINGS AND CONSTRUCTION. PHASE 1 AND 3 WILL BE UPPER LEVEL INTERIOR ALTERATION WORK FOR THE TENANT FIT-OUT. PHASE 4 WILL BE THE LOWER LEVEL INTERIOR ALTERATION WORK FOR THE TENANT FIT-OUT. PHASE 2 WILL BE THE NEW CONVENIENCE STAIR TO THE ROOF, ELEVATOR AND PENTHOUSE VESTIBULE FOR MAINTENANCE ACCESS. PHASE 2 WILL ALSO INCLUDE A PARTIAL FLOOR DEMOLITION AND REINFORCEMENT TO ALLOW FOR A DOUBLE HEIGHT SPACE AT THE LOWER LEVEL. THIS 'PHASE 2' PERMIT DRAWING SCOPE OF WORK: EXISTING EGRESS STAIR, ELEVATOR, AND PARTIAL FLOOR DEMOLITION TO ALLOW FOR NEW CONVENIENCE STAIR, ELEVATOR TO THE ROOF AND PENTHOUSE VESTIBULE FOR MAINTENANCE ACCESS ONLY. NEW DOUBLE HEIGHT SPACE AT THE LOWER LEVEL WITH FIRE RATED PARTITIONS AT THE UPPER LEVEL TO PROTECT THE OPENING. TENANT FIT-OUT TO INCLUDE DEMOLITION OF EXISTING PARTITIONS; AND CONSTRUCTION OF NEW PARTITIONS AND DOORS. NEW ELECTRICAL WORK TO MODIFY LIGHTING AND POWER TO REFLECT NEW PLAN. ALL ELECTRICAL RUNS ARE TO CONNECT TO EXISTING BUILDING MAIN ELECTRICAL ROOM. EXISTING DUCTWORK WILL BE MODIFIED TO REFLECT NEW PLAN. SPRINKLER, FIRE DETECTION, AND FIRE ALARM WORK WILL BE DONE ON A DESIGN BUILD BASIS BY THE CONTRACTOR HIRED VENDOR. THESE VENDORS WILL OBTAIN THEIR OWN PERMITS BY PRODUCING THEIR OWN CODE CONFORMING DESIGN USING THEIR OWN STAMPED AND SIGNED DRAWINGS.

Filed Aug 3, 2026
$1,251,850

Property record

The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.