2119 CHAMPLAIN ST NW

WASHINGTON, DC 20009 · DC — Ward 1

Permit activity

Jan 2026 → Sep 2026
  1. Building permit issuedJan 26
  2. Building permit issuedFeb 27
  3. Building permit issuedMar 4
  4. Building permit issuedMar 25
  5. Building permit issuedJul 15
  6. Building permit issuedSep 1
DC-P2611448
PERMIT ISSUED

Building permitplumbing and gas

Owner: POTOMAC ELECTRIC POWER COMPANY

Issued Sep 1, 2026
DC-D2300320-EXT-1
PERMIT ISSUED

Building permitpermit

Issued Jul 15, 2026
DC-UT2600017
PERMIT ISSUED

Building permitmiscellaneous

Removal of one (1) 5,000-gallon aboveground storage tank (AST)

Applicant: CARI FINCH · Owner: POTOMAC ELECTRIC POWER COMPANY

Issued Mar 25, 2026
DC-E2606157
PERMIT ISSUED

Building permitelectrical

Owner: POTOMAC ELECTRIC POWER COMPANY

Issued Mar 4, 2026
DC-B2502663
PERMIT ISSUED

Building permitaddition alteration repair

The Champlain Substation is located on a 0.7-acre site at the corner of Champlain Street and Old Morgan School Place in Northwest Washington (the Site). The third side of the site is bounded by Ontario Road. The Site contains the two-story Substation building on its northwest corner facing Champlain Street, which was constructed in 1930 and design by Arthur B. Heaton in the Art Deco style. The west and south elevations are clad in brick with a granite foundation and limestone accents; the south elevation includes a series of six distinctive buttresses. The east elevation is constructed of red brick laid in American bond pattern. The north elevation is parged with a mural. Also, on the Site is a substantial amount of outdoor, unenclosed and unscreened electrical equipment. The project will partially demolish the existing Champlain Substation as described in the approved Mayors Agent application HPA No. 23-318 dated January 3, 2024. This includes the outdoor, unenclosed and unscreened electrical equipment. The demolition portion of the project is currently in the demolition permit process #D2300320. With the selective demolition the project will adaptively reuse the existing Substation building to house an expanded and updated electric substation. PEPCO will preserve the existing west fa?ade and portions of the south fa?ade including two of the buttresses, which are the existing buildings most conspicuous historic elements. New construction would extend east from the preserved portion of the existing substation and constitute a new two and a half story plus cellar building. The new building will include 43,119 SF of area for enhancing the electrical service, adding capacity, and stronger systems. The project will also incorporate new landscape areas on the east and west sides and streetscape elements. This includes bioretention areas, permeable pavers, green walls, and solar panels on the roof of the station to comply with the GAR requirement of 0.3.

Applicant: DOUGLAS FOSTER · Owner: POTOMAC ELECTRIC POWER COMPANY

Issued Feb 27, 2026
DC-TC2600003
PERMIT ISSUED

Building permitmiscellaneous

Site of Pepco Substation 25 ERECT TOWER CRANE AT 2119 CHAMPLAIN STREET NW

Applicant: STEPHANIE KEPLER · Owner: POTOMAC ELECTRIC POWER COMPANY

Issued Jan 26, 2026

Property record

SSL 2562 0097
Lot
29,163 sq ft
Assessed
$4,484,340
Land / improvements
$3,779,230 / $705,110

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current to Sep 21, 2026
← Browse all permitsSearch this address in the feed →