WASHINGTON, DC 20008 · DC — Ward 2
Building permit — special building
In the Sheridan-Kalorama Historic District SCOPE INCLUDES: A RECOVER OF THE EXISTING ROOFING SYSTEM WITH A NEW ROOFING MEMBRANE; THE REPLACEMENT OF THE EXISTING ROOF DECK SURFACE IN-KIND; REPAIR AND REPLACEMENT OF EXTERIOR ELEMENTS AT THE ROOF LEVEL AS NEEDED TO TIE NEW WORK INTO EXISTING WORK SCHEDULED TO REMAIN. NO STRUCTURAL, MECHANICAL, PLUMBING OR ELECTRICAL WORK PROPOSED IN THIS SCOPE OF WORK.
Applicant: ADAM GREENE · Owner: WESTMORELAND COOPERATIVE
Building permit — electrical
Owner: WESTMORELAND COOPERATIVE
Building permit — solar system
HISTORIC To install 79.2 KWdc on the roof of the building. Revision to permit SOL2602183. Revising the inverter type from Enphase inverters to solar edge inverter and changing the electrical design.
Applicant: MARGO RICKS · Owner: WESTMORELAND COOPERATIVE
Building permit — mechanical
Owner: EDWARD FLEISCHMAN
Building permit — alteration and repair
In the Sheridan-Kalorama Historic District REVISION TO PERMIT B2603175 to CORRECT AND CITE UNIT NUMBER per Inspector's demands. NO CHANGE IN SCOPE OF CONSTRUCTION WORK. PLEASE NOTE THIS PERMIT IS FOR UNIT #252
Applicant: KE-MAURELLE PIERRE-PREDDIE · Owner: WESTMORELAND COOPERATIVE
Building permit — solar system
HISTORIC to install 79.2KW DC on the roof of the building.
Applicant: MARGO RICKS · Owner: WESTMORELAND COOPERATIVE
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: LENIN SANDOVAL · Owner: WESTMORELAND COOPERATIVE
Building permit — alteration and repair
Kitchen remodel-new cabinets, appliances, flooring
Applicant: FRANK BRAXTON · Owner: WESTMORELAND COOPERATIVE
Building permit — plumbing and gas
Owner: WESTMORELAND COOPERATIVE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.