All permits

215 PENNSYLVANIA AVE SE

WASHINGTON, DC 20003 · DC — Ward 6

Permit activity

Jul 2026 → Sep 2026
  1. Building permit issuedJul 8
  2. Building permit issuedAug 12
  3. Building permit issuedSep 15
DC-B2600898
PERMIT ISSUED

Building permitalteration and repair

CFA / HISTORIC SCOPE OF WORK REMOVE (2) EXISTING 6691 LOBBY ATMs FRAME IN WALL OPENINGS, PATCH/PAINT WALL TERMINATE ELECTRICAL AS REQUIRED. DEMOLISH APPROX. 60X60" SQUARE OF BUILDING SLAB POUR NEW 12" CONCRETE SLAB WITH REBAR MAT FRAME, DRYWALL AND FINISH NEW INTERIOR WALLS FOR 430 ALCOVE REMOVE GLASS AND MIDDLE MULLION INSTALL NEW HORIZANTAL MULLION AND GLAZING INSTALL CUSTOM WF9200 RFO SURROUND INSTALL 430V

Applicant: VICKIE ASHMEAD · Owner: PUBLIC CITIZEN INC

Issued Sep 15, 2026
DC-E2611847
PERMIT ISSUED

Building permitelectrical

Electrical Trade Permit

Applicant: KEVIN MERUVIA VARGAS · Owner: PUBLIC CITIZEN INC

Issued Aug 12, 2026
DC-B2603611
PERMIT ISSUED

Building permitalteration and repair

In the Capitol Hill Historic District In the Commission of Fine Arts jurisdiction area INTERIOR RENOVATION OF AN EXISTING COMMERCIAL RETAIL BANK IN A 3 STORY MULTI-TENANT BUILDING. SCOPE OF WORK INCLUDES THE FOLLOWING: DEMOLITION OF LIGHT FIXTURES, WORKSTATION PANELS, PORTIONS OF FLOOR AND CEILING FINISHES; AND CONSTRUCTION OF NEW NON-STRUCTURAL PARTITIONS, CEILINGS, POWER/DATA, RELOCATION OF EXISTING OFFICE FURNITURE, ADDITION OF NEW GRAB BARS IN RESTROOMS, AND MODIFICATIONS TO ELECTRICAL SYSTEMS. THE RENOVATION IS CLASSIFIED AS A LEVEL 2 ALTERATION ACCORDING TO THE 2017 DC EXISTING BUILDING CODE. THEREFORE, THE APPLICABLE COMPLIANCE METHOD IS SECTION 301.3.2 WORK AREA COMPLIANCE METHOD, ALONG WITH THE REQUIREMENTS OUTLINED IN CHAPTERS 5 THROUGH 13, ESPECIALLY CHAPTER 8 OF THE 2017 DC EXISTING BUILDING CODE FOR A LEVEL 2 ALTERATION. NO CHANGE OF OCCUPANCY, NO SF ADDED, NO INCREASE IN OCCUPANT LOAD.

Applicant: ROSHAUN DENNIS · Owner: PUBLIC CITIZEN INC

Issued Jul 8, 2026

Property record

SSL 0762 0809
Lot
4,803 sq ft
Assessed
$6,495,970
Land / improvements
$1,387,110 / $5,108,860

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current to Sep 21, 2026
← Browse all permitsSearch this address in the feed →