WASHINGTON, DC 20011 · DC — Ward 5
Building permit — alteration and repair
TWO FAMILY FLAT INTERIOR RENOVATION:KITCHEN AND BATHROOM REMODELING, FRAMING, DRYWALL, INTERIOR DOORS, WINDOWS, TRIM, PAINTING, FLOORING, RELOCATE STAIR, REPAIR/REPLACE DAMAGED FLOOR JOISTS AS NEEDED, INSTALL HEADERS, REPLACE EXISTING 4 INCH SLAB, MECHANICAL, ELECTRICAL AND REPLACE PLUMBING FIXTURES IN KIND.
Applicant: SHERWIN COOPER
Building permit — building
Applicant: BERT DANIEL · Owner: SHERWIN COOPER
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.