WASHINGTON, DC 20059 · DC — Ward 1
Building permit — electrical
Electrical Trade Permit
Applicant: WILLIAM DIAZ · Owner: HOWARD UNIVERSITY
Building permit — alteration and repair
THIRD PARTY REVIEWED - INTERIOR REMODEL OF EXISTING SPRINKLERED MERCANTILE SPACE. THERE IS NOCHANGE TO USE OR OCCUPANCY. INSTALLING NEW WALLS, LIMITED ACCENT LIGHTING, LIKE FOR LIKE ELECTRICAL SWITCH OUT FOR NEW FIXTURES, NEW RETAIL FIXTURES, ANDNEW FINISHES
Applicant: JOSEPH G. JARVIS · Owner: HOWARD UNIVERSITY
Building permit — alteration and repair
The project scope includes reconfiguring an existing laundry room and fitness room into a larger laundry room located in a large 9 story dormitoray building.
Applicant: OLUSOLA PYNE · Owner: HOWARD UNIVERSITY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.