WASHINGTON, DC 20003 · DC — Ward 6
Building permit — addition alteration repair
SCOPE OF WORK TO INCLUDE NEW REAR ADDITION TO 229/231 PENNSYLVANIA AVENUE SE WITH MODIFICATIONS TO THE EXISTING EXTERIOR REAR FACADES AND EXPANDING EXISTING OPENINGS IN THE PARTY WALL TO ALLOW FOR IMPROVED CONNECTIONS BETWEEN STRUCTURES. THE GROUND FLOOR WILL CONTAIN A RESTAURANT AND SUPPORTING COMMERCIAL KITCHEN, WITH KITCHEN PREP AND STORAGE SPACES LOCATED IN THE BASEMENT. SECOND AND THIRD FLOORS TO BE WARM LIT SHELLS WITH EGRESS, PLUMBING STUBS, AND SHAFTS FOR MEP AND KITCHEN EQUIPMENT AS REQUIRED. INTERIORS TO BE DESIGNED IN THE FUTURE AS A TENANT FIT OUT. THE RESTAURANT WILL CONTINUE TO ACROSS THE FIRST FLOOR TO THE ALLEY GARAGE AT 203 3RD STREET REAR. THE ALLEY GARAGE WILL CONTAIN TWO RESTROOMS AND A BAR, CONNECTING BACK TO THE 229/231 WITH AN ENCLOSED COURTYARD. SCOPE OF WORK TO INCLUDE NEW PARTITIONS, MILLWORK, CEILINGS, LIGHTING, FINISHES, FURNITURE, AND EQUIPMENT. NEW OPENINGS IN EXISTING FLOOR FOR EGRESS STAIRS AND ELEVATOR. SERVICE ELEVATOR AND OVERRUN LOCATED IN THE REAR ADDITION. SCOPE OF WORK TO INCLUDE NEW HVAC, PLUMBING AND ELECTRICAL WORK TO ACCOMPLISH NEW DESIGN. SCOPE OF WORK TO INCLUDE A NEW TERRACE ON AN EXISTING ROOF. EXISTING STRUCTURE TO REMAIN WHERE POSSIBLE AND BE REINFORCED TO ACCOMMODATE NEW EGRESS AND ELEVATOR SHAFTS.NEW FIRE ALARM AND SPRINKLER SYSTEM INCLUDED IN SCOPE OF WORK. EXISTING UTILITY INFRASTRUCTURE TO BE REUSED.
Applicant: CONSERVATIVE PARTNERSHIP INSTITUTE · Owner: CLEAR PLAIN LLC
Building permit — demolition
DEMOLITION OF EXISTING INTERIOR NON-LOAD BEARING WALLS, FINISHES, MILLWORK, MECHANICAL/ELECTRICAL/PLUMBING, MILLWORK, LIGHT FIXTURES, CEILINGS, ETC. DEMOLITION OF A NON-CONFORMING BUILT ITEM LOCATED AT THE REAR OF 229 PENNSYLVANIA AVE SE. DEMOLITION OF THE EXISTING OUTDOOR COVERED PATIO AT 229 WILL INCLUDE REMOVING TWO WOODEN FENCE ENCLOSURES AND THE TARP ABOVE. NOTE THE ITEM EXTENDS BEYOND THE PROPERTY LINE. EXISTING UTILITY INFRASTRUCTURE TO REMAIN.
Applicant: CONSERVATIVE PARTNERSHIP INSTITUTE · Owner: CLEAR PLAINS LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.