WASHINGTON, DC 20007 · DC — Ward 3
Building permit — alteration and repair
DEMOLITION WORK INCLUDES REMOVAL OF EXISTING COUNTERTOPS, RESPECTIVE BASE CABINETS, AND TALL CABINETS AT PREP ROOM. ARCHITECTURAL WORK INCLUDES REPLACEMENT OF COUNTERTOP AND BASE CABINETS, IN KIND. A NEW COUNTER AND BASE CABINETS IN THE PREP ROOM. PLUMBING WORK INVOLVES ADDITION OF FOUR NEW SINKS, TO BE TIED INTO EXISTING PLUMBING LINE. ELECTRICAL WORK INCLUDES GFCI RECEPTACLES AT NEW WET LOCATIONS AND POWER FOR NEW EQUIPMENT IN PREP ROOM.
Applicant: JOSEPH JARVIS (RAMCO) · Owner: FIELD SCHOOL THE
Building permit — sheeting and shoring
Revision to SH2600007 - Redesign support of excavation for the Aude Building: Excavationdepth increased by 5ft due to the soil conditions. Add support Of excavation For Ductbank(South of Meeting House):To stabilize the new Ductbank installed higher than the bottom ofexcavation. Add support of excavation around Bioretention: To reducebenching/excavation/sloping due to the site conditions & constraints
Applicant: JOSEPH G. JARVIS JARVIS (RAMCO) · Owner: FIELD SCHOOL THE
Building permit — electrical
Owner: FIELD SCHOOL THE
Building permit — electrical
Owner: FIELD SCHOOL THE
Building permit — miscellaneous
This project consists of the addition of a new two-story addition including classrooms associated with Group E, at an existing school, grades 6 through 12. Work includes sitework, curtainwall, storefront, masonry building envelope, new green roof, new pv panels, interior partitions, ceilings, lighting, mechanical, electrical, plumbing, flooring, fixtures, and finishes.
Applicant: JOE CARBONARA · Owner: FIELD SCHOOL THE
Building permit — plumbing and gas
Owner: FIELD SCHOOL THE
Building permit — alteration and repair
Interior alteration to 200SqFt grade level to include partitions, ceilings, lighting, electrical, life safety, fixtures, and finishes.
Applicant: JOSEPH JARVIS (RAMCO) · Owner: FIELD SCHOOL THE
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: DAWN NATION · Owner: FIELD SCHOOL THE
Building permit — electrical
Owner: FIELD SCHOOL THE
Building permit — miscellaneous
Installation of Tower Crane at 2301 Foxhall Rd NE
Applicant: JOSEPH G. JARVIS (RAMCO) · Owner: FIELD SCHOOL THE
Building permit — plumbing and gas
Owner: FIELD SCHOOL THE
Building permit — miscellaneous
Drilling 12 closed loop geothermal wells at 600 feet each.
Applicant: DONNA PEREZ · Owner: FIELD SCHOOL THE
Building permit — miscellaneous
This project consists of the addition of a new two-story addition including classrooms associated with Group E, at an existing school, grades 6 through 12. Work includes sitework, curtainwall, storefront, masonry building envelope, new green roof, new pv panels, interior partitions, ceilings, lighting, mechanical, electrical, plumbing, flooring, fixtures, and finishes.
Applicant: JOE CARBONARA · Owner: FIELD SCHOOL THE
Building permit — sheeting and shoring
Construction of the earth retention system per drawings
Applicant: JOSEPH G. JARVIS (RAMCO) · Owner: FIELD SCHOOL THE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.