WASHINGTON, DC 20003 · DC — Ward 7
Building permit — miscellaneous
Historic-CFA Perform a total of nineteen (19) 6-inch hollow stem SPT Borings to a maximum depth of 100 feet below current site grades, and a total of twenty-four (24) 2-inch direct push Geoprobe soundings to a maximum depth of 30 feet below current site grades. All work will be performed to obtain geotechnical information under the supervision of a Professional Engineer licensed in the District of Columbia.
Applicant: JACOB SYBOR · Owner: UNITED STATES OF AMERICA
Building permit — miscellaneous
CFA / H Completion of dewatering wells for placement of a new MS4 sewer line. 85 Borings to be installed along the trench to allow for removal of groundwater to facilitate placement of the sewer.
Applicant: MATT VOORHEES · Owner: UNITED STATES OF AMERICA
Building permit — miscellaneous
CFA / H Geotechnical borings for soil sample collection for RFK Stadium Road Project. Borings will be drilled to 10 feet maximum. Backfilled, grouted and Asphalt patched. All cuttings will be contanerized and tetsted for hazardous materials
Applicant: STANLEY DOUGLAS · Owner: CHRISTOPHER CONROY
Building permit — civil plans
THE RFK REDEVELOPMENT PROJECT WILL CATALYZE THE TRANSFORMATION OF THE ENTIRE 180-ACRE CAMPUS, WHICH WILL INCLUDE HOUSING, PARKS, RECREATION FACILITIES, HOTELS, RESTAURANTS, RETAIL SPACES, AND NEIGHBORHOOD AMENITIES. THERE ARE MULTIPLE "DISTRICTS" WITHIN THE 180-ACRE CAMPUS, AND AS SUCH, THE PROJECT WILL BE COMPLETED OVER SEVERAL PHASES. THE FOCUS OF THIS PACKAGE IS ON THE STADIUM DISTRICT (WHICH GENERALLY LIES WITHIN THE BOUNDS OF C ST NE, INDEPENDENCE AVE SE, AND 22ND ST NE). THE FIRST STAGE OF THE PROJECT FOR THE "STADIUM DISTRICT" INCLUDES THE RELOCATION OF AN EXISTING STORM SEWER NETWORK TO CLEAR THE WAY FOR THE CONSTRUCTION OF A NEW STADIUM. THE WORK FOR THE STORM SEWER RELOCATION WILL BE COMPLETED IN PHASES, ENSURING THAT STORM SEWER CONVEYANCE IS MAINTAINED THROUGHOUT THE SITE DURING THE ENTIRE DURATION OF THE PROJECT. ***FINAL APPROVAL REQUIRED BY WMATA TO PERFORM WORK ON WMATA PROPERTY OR ON WMATA ZONE OF INFLUENCE***
Applicant: DARYL THOMAS; ZACH HERSHEY; ZACH HERSHEY · Owner: GOVERNMENT OF THE DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.