WASHINGTON, DC 20037 · DC — Ward 2
Building permit — electrical
Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — elevator - repair
Replace rope gripper
Applicant: KELLY RICKER · Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — miscellaneous
AT&T proposes to remove (6) existing antennas and (12) existing RRHs, to install (6) new antennas and (12) new RRHs.
Applicant: CHRIS BIRELEY · Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — alteration and repair
install (5) ANSUL R-102 commercial kitchen hood fire suppression systems - current protection is by the water-wash hood only - Fairmont Hotel
Applicant: JENNIFER PADDY · Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — plumbing and gas
Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — electrical
Owner: LHCW HOTEL HOLDING (2002) LLC
Building permit — alteration and repair
BFPE International has been contracted to provide a new clean agent fire suppression system for the Fairmont Hotel project located in Washington, D.C. The system will protect the Computer Room. The system will be a main only system.
Applicant: BILL SAUNDERS · Owner: LHCW HOTEL HOLDING (2002) LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.