WASHINGTON, DC 20009 · DC — Ward 1
Building permit — alteration and repair
THE MARIETTA BUILDING. BUILDING PERMIT REVISION-ADDENDUM TO AN EXISTING ISSUED BUILDING PERMIT B2303073-EXT-1. PROPOSED WORK CONSIST ON ALTERATION-REPAIR-MODIFICATION TO THE FOLLOWING FLOORS 1ST, 2ND AND ROOF LEVEL THAT INCLUDES HVAC SYSTEM UPGRADE TO ONE ON ONE VRF BASED SPLIT SYSTEM. TWO-HOURS RATED SHAFT FOR REFRIGERANT PIPING HAS BEEN INCLUDED IN EACH DWELLING UNIT. NEW CONCRETE PLATFORM TO BE ADDED FOR TRASH ENCLOSURE AT THE REAR SIDE OF THE BUILDING, AS PER PLANS AND DOCUMENTS. SOLAR PANELS ON ROOF BALLASTED RACKING SYSTEM ARE NOT INCLUDED UNDER THE SCOPE OF THIS PERMIT.
Applicant: LUIS GUILLEN · Owner: JUBILLEE HOUSING LIMITED PARTNERSHIP
Building permit — permit
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.