25 WAYNE AVE

SILVER SPRING, MD, 20901 · Montgomery County

Permit activity

May 2026 → Aug 2026
  1. Right-of-way permit appliedMay 5
  2. Right-of-way permit issuedMay 11
  3. Building permit appliedMay 27
  4. Building permit issuedAug 10
MC-1159435
Issued

Building permitcommercial building

120/240V 200A Panel, (4) 32A Chargers 1. Survey and develop design drawings for permitting and installation. 2. Coordinate with utility provider for service requirements and upgrades. 3. Receive owner sign off on plans and coordination before proceeding. 4. Pull permits as necessary. 5. Install conduit and wire from utility secondary (25�) to H-frame for panels. 6. Pour panel pad and build H-frame. 7. Provide and install Service Rated Panel, breakers for chargers and all associated wiring and terminations. 8. Provide and install raceway and wire from new panel to new charger locations as designated on site layout. 9. Provide, mount, and terminate (1) Dual Port Pedestal Mount and (2) Single Port Pedestal Mount Chargers. 10. Provide and install bolt down bollards in front of chargers. (Total 6)

Issued Aug 10, 2026
Filed May 27, 2026
$1,749
MC-ROW-423993
Issued

Right-of-way permitpublic right of way

Replace pole (797424-720650), cable and associated equipment in accordance with PEPCO plan. WO20360389-PEPCO WILL HEAVY UP EX 50KVA XFMR WITH 100KVA XFMR. PEPCO WILL REPLACE EXISITNG 45-2 POLE WITH NEW 50-2 POLE. PEPCO TO BUILD 1' OF 4" PVC 1-WAY (1Hx1V) CONDUIT FROM PROPOSED PEPCO POLE TO THE CUSTOMER'S STUB POINT(1' PAST FENCE. PEPCO WILL INSTALL 1 SET OF 4/0 AL URD CABLE FROM PEPCO SERVICE POLE TO PROPOSED 200A METER (13'). Work shall comply with the current County Specifications for Utility Construction Permit, the direction of the DPS Inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG). A full width mill and overlay shall be required should the patch not meet the specifications as set forth by the County Specifications and as directed by the DPS ROW inspector. All adjustments of existing utilities within the work area are the responsibility of the permittee prior to mill and overlay and acceptance of work. Restoration of the right of way shall be made "in-kind" of any damages done to the existing improvements in the public right-of-way, including haul route, caused by construction. All lane closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the DPS ROW Inspector. Permittee must have preconstruction meeting with DPS ROW inspector prior to beginning of construction work. Permittee must check and coordinate with other permitted construction on site.

Issued May 11, 2026
Filed May 5, 2026

Property record

The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

Montgomery building
current to Sep 23, 2026
Montgomery right of way
current only to May 12, 2026 (feed read Aug 30, 2026)
← Browse all permitsSearch this address in the feed →