WASHINGTON, DC 20002 · DC — Ward 5
Building permit — miscellaneous
Ongoing interior and exterior renovation construction at Spingarn High School. Work to included weekends and holidays.
Applicant: DARYL SMITH · Owner: DISTRICT OF COLUMBIA
Building permit — civil plans
HSTORIC/CFA THE PROJECT INVOLVES THE REMOVAL OF AN EXISTING ARTIFICIAL TURF FIELD AND TRACK SURFACE WHICH WILL BE REPLACED WITH A NEW ATHLETIC FIELD AND TRACK SURFACE. THE PROJECT WILL NOT DISTURB ANY LAND, THE ENTIRE SCOPE FOR THIS PROJECT IS PEELING OFF THE EXISTING TURF AND REPLACING WITH A NEW ONE. THERE IS NO DISTURBANCE AND THEREFORE THERE WILL NOT BE A NEED FOR A DOEE SWM PLAN. ANTICIPATING THE POSSIBILITY OF DISTURBANCE OF OVER 50 SQUARE FEET AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN PREPARED. THE PREDOMINANT EROSION AND SEDIMENT CONTROL MEASURES SHALL BE SILT FENCE, FILTER SOCK, AND STANDARD INLET PROTECTION.
Applicant: ADDISU WOLDESENBET · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Ongoing interior and exterior renovation construction at Spingarn High School. Working holidays and weekends.
Applicant: DARYL SMITH · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Ongoing interior and exterior construction at Spingarn High School - Holiday/After Hour Work on Memorial Day
Applicant: DARYL SMITH · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Renovation of Spingarn High School into an infrastructure academy with interior and exterior construction.
Applicant: DARYL SMITH · Owner: DISTRICT OF COLUMBIA
Building permit — sheeting and shoring
HISTORIC Support of excavation in order to excavate to top of existing foundation for an existing retaining wall in order to install waterproofing.
Applicant: DFM PERMITS · Owner: DISTRICT OF COLUMBIA
Building permit — electrical
Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Continue exterior and interior construction of Spingarn High School
Applicant: DARYL SMITH · Owner: DISTRICT OF COLUMBIA
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.