WASHINGTON, DC 20037 · DC — Ward 2
Building permit — permit
Building permit — permit
Building permit — alteration and repair
CFA / H The proposed construction involves isolated concrete column repairs on the 7th floor of the Watergate East building at specific units. The 13-story building will remain occupied during the work. The project requires a contractor to prepare the existing columns, clean and supplement the reinforcement with epoxy-coated bars, and apply a specialized concrete patching material. The work must comply with current District of Columbia building codes and necessitates a 72-hour wet cure for the new material.
Applicant: HENRY ALFARO · Owner: WATERGATE EAST INC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.