WASHINGTON, DC 20001 · DC — Ward 1
Building permit — alteration and repair
RENOVATION OF CELLAR AND 1st FLOOR OF AN EXISTING 3-STORY 6 -UNIT APARTMENT BUILDING WITH NO ADDITIONS. CELLAR TO GET A RENOVATED COMMUNITY ROOM. FIRST FLOOR CONVERTS 2 VACANT SPACES TO TWO (2) NEW APARTMENTS. THE WORK INVOLVES CREATING A NEW CONNECTION TO THE SECOND STAIR AT THE 1ST FLOOR, ONLY, FOR ALL RESIDENTS. PROPOSED NUMBER OF DWELLING UNITS: EIGHT (8) AREA AFFECTED 2772 SF
Applicant: DAN WILLIAMS · Owner: BALDWIN HOUSE COOPERATIVE ASSOCIATION
Building permit — demolition
SELECTIVE INTERIOR DEMOLITION OF EXISTING NON-STRUCTURAL WALLS, FINISHES, AND FIXTURES (INCLUDING KITCHEN AND BATHROOM COMPONENTS) IN PREPARATION FOR FUTURE RENOVATION AND UPGRADES UNDER SEPARATE PERMIT.
Applicant: DAN WILLIAMS · Owner: BALDWIN HOUSE COOPERATIVE ASSOCIATION
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.