WASHINGTON, DC 20007 · DC — Ward 2
Building permit — alteration and repair
THIS IS A REVISION TO EXISTING PERMIT B2604489 TO INCLUDE STRUCTURAL CHANGES. THE REVISED STRUCTURAL DESIGN INCORPORATES ADDITIONAL LVL BEAMS, STEEL FRAMING MEMBERS, LINTELS, FLOOR FRAMING REINFORCEMENT, AND CONNECTION DETAILS REQUIRED TO SUPPORT THE FINAL STAIR OPENING CONFIGURATION.
Applicant: LAWRENCE D TRUE · Owner: TRUE, LAWRENCE D
Building permit — plumbing and gas
Owner: TRUE, LAWRENCE D
Building permit — electrical
Owner: TRUE, LAWRENCE D
Building permit — alteration and repair
In the Georgetown Historic District In the Commission of Fine Arts jurisdiction area THIS PROJECT CONSISTS OF AN INTERIOR-ONLY RENOVATION OF AN EXISTING SINGLE-FAMILY RESIDENCE. SCOPE OF WORK INCLUDES RECONFIGURATION OF INTERIOR PARTITIONS, RELOCATION OF AN EXISTING STAIR, AND ASSOCIATED ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING MODIFICATIONS AS REQUIRED TO SUPPORT THE NEW LAYOUT. NO CHANGES ARE PROPOSED TO THE BUILDING FOOTPRINT, EXTERIOR WALLS, ROOFLINE, HEIGHT OR EXTERIOR FA?ADE. ALL WORK IS CONTAINED WITHIN THE EXISTING STRUCTURE. AREA AFFECTED 2100 SF
Applicant: LAWRENCE D TRUE · Owner: BROWN, LINDA J
Building permit — demolition
CFA / H THIS PERMIT IS FOR INTERIOR, NON-STRUCTURAL DEMOLITION ONLY WITHIN AN EXISTING RESIDENTIAL DWELLING. WORK INCLUDES REMOVAL OF NON-LOAD-BEARING PARTITIONS, INTERIOR FINISHES, CEILINGS, CABINETRY, AND FIXTURES AS INDICATED ON THE DRAWINGS. NO EXTERIOR WORK IS INCLUDED UNDER THIS PERMIT.
Applicant: LAWRENCE D TRUE AND LINDA J BROWN · Owner: TRUE, LAWRENCE D
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.