WASHINGTON, DC 20015 · DC — Ward 6
Building permit — alteration and repair
Revision to B2605020 of one landing 3rd floor, the framing was reinforced and extended to accommodate existing conditions.
Applicant: FREDDY H · Owner: LEVIN, BETTE S
Building permit — elevator - new
Install a PVE 37 elevator in an existing stair shaft.
Applicant: FREDDY HERRERA · Owner: LEVIN, HARVEY A
Building permit — electrical
Owner: LEVIN, HARVEY A
Building permit — alteration and repair
Remove & reinstall stairs to install a pneumatic Vacuum elevator PVE 37 in an existing stair shaft - 5 stops.
Applicant: FREDDY H · Owner: LEVIN, BETTE S
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.