BROOKEVILLE, MD, 20833 · Montgomery County
Building permit — building residential permit
Construct a 14' x 47' deck with (2) 4' x 4' landings with steps to grade,New Deck
Building permit — building residential permit
Construct new detached SFD with attached garage and limited use driveway on a single lot in approved subdivision
Right-of-way permit — public right of way
Residential Driveway - Install temporary stabilized construction entrance and construct MCDOT Standard MC-301.03 type driveway apron with culvert pipe in accordance with the County Design Standards. All work in the ROW shall be performed as directed by DPS ROW inspector and in accordance with the Public Right-of-Way Accessibility Guidelines (PROWAG).Restoration shall be made "in-kind" for any damage done to publicly owned property located within public ROWs that has resulted from accessing the subject property to carry out on-site improvements or repairs, or along routes used within public ROWs including delivery or removal of material and equipment. All lane and sidewalk closures and traffic controls shall comply with the MCDOT approved Traffic Control Plans, Work Zone Temporary Traffic Control (WZTTC) standards and directions of the inspector. A Maryland DNR Roadside Tree Project permit or MCDPS Roadside Tree Plan is not required for this project.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.