All permits

3001 CONNECTICUT AVE NW

WASHINGTON, DC 20008 · DC — Ward 3

Permit activity

Apr 2026 → Oct 2026
  1. Building permit issuedApr 7
  2. Building permit issuedApr 14
  3. Building permit issuedSep 9
  4. Building permit issuedOct 21
DC-BCIV2600173
PERMIT ISSUED

Building permit — civil plans

Historic and CFA Proposed improvements include utility connections to the existing electrical infrastructure for new pad mounted switches (PMSW). Proposed site improvements include general repair of existing curb, concrete drainage channel, asphalt and concrete paving as needed for utility trenching. New concrete pads for the proposed electrical equipment.

Applicant: DYLAN PIKE MILLER · Owner: SMITHSONIAN INSTITUTION

Issued Oct 21, 2026
DC-BCIV2600099
PERMIT ISSUED

Building permit — civil plans

This project redevelops the unused habitat space previously for the bison on the campus of Smithsonian Institution's National Zoo for a new animal habitat. Approximately 36,000 square feet of redevelopment includes rerouting of existing utilities, introduction of new utility piping, and the expansion of the existing Care Building. Erosion and sedimentation controls will be required. Stormwater best management practices, bioretention and planter box, and the preservation of select existing trees are planned to meet retention and detention requirements.

Applicant: SCOTT MILLER · Owner: UNITED STATES OF AMERICA

Issued Sep 9, 2026
DC-BCIV2400123-EXT-2
PERMIT ISSUED

Building permit — permit

Issued Apr 14, 2026
DC-BCIV2500118
PERMIT ISSUED

Building permit — civil plans

Commission of Fine Arts jurisdiction area ***FEDERAL National Zoological Park This project consists of the construction of bridge abutment scour and slope failure countermeasures. These countermeasures consist of riprap armoring and construction of a rock cross vane in the Rock Creek streambed.

Applicant: BRAD GLATFELTER · Owner: SMITHSONIAN INSTITUTE

Issued Apr 7, 2026

Property record

SSL PAR 00670006
Lot
7,430,465 sq ft
Assessed
$392,545,750
Land / improvements
$183,383,880 / $209,161,870

Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.

What this page cannot show

These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.

DC building
current only to Nov 2, 2026 (feed read Nov 8, 2026)
← Browse all permitsSearch this address in the feed →