WASHINGTON, DC 20007 · DC — Ward 2
Building permit — mechanical
Owner: M STREET FIVE LIMITED PARTNERSHIP
Building permit — electrical
Owner: M STREET FIVE LIMITED PARTNERSHIP
Building permit — alteration and repair
CFA / H TENANT IMPROVEMENT OF A RETAIL SPACE AT STREET LEVEL. INSTALLATION OF NEW INTERIOR NON-LOAD BEARING WALLS, NEW FLOOR FINISHES, NEW CEILING, NEW LIGHTING, NEW WALL FINISHES, NEW MILLWORK FIXTURES, AND NEW MECHANICAL AND ELECTRICAL.
Applicant: COLIN F CLARK · Owner: M STREET FIVE LIMITED PARTNERSHIP
Building permit — alteration and repair
In the Georgetown Historic District In the Commission of Fine Arts jurisdiction area Exterior facade work to include: painting of the brick, repair or replace to match existing cornice, electrostatic painting of the existing storefront system and entry doors with new door handles, and a new fabric awning. Signage under a separate permit.
Applicant: COLIN F CLARK · Owner: M STREET FIVE LIMITED PARTNERSHIP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.