WASHINGTON, DC 20007 · DC — Ward 2
Building permit — electrical
Electrical Trade Permit
Applicant: ANDREW JOHNSON · Owner: JAMESTOWN PREMIER GEORGETOWN PARK CORP
Building permit — plumbing and gas
Plumbing trade Permit
Applicant: SAMEER ALI · Owner: JAMESTOWN PREMIER GEORGETOWN PARK CORP
Building permit — electrical
Electrical Trade Permit
Applicant: ANDREW JOHNSON · Owner: JAMESTOWN PREMIER GEORGETOWN PARK CORP
Building permit — mechanical
Mechanical trade Permit
Applicant: KAMRAN GHAFFARI · Owner: JAMESTOWN PREMIER GEORGETOWN PARK CORP
Building permit — tenant layout
CFA / H Tenant layout for Brazilian Jiu-Jitsu studio including interior partitions, training area, reception, restroom(s), storage, and associated MEP work. Tenant Layout for 3,743 sq. ft. Space within an existing commercial building. Scope includes interior build-out/alterations for proposed tenant space, including new interior partitions, doors, and associated mechanical, electrical, and plumbing work. No structural work proposed. No exterior work proposed.
Applicant: SANDRO SILVA · Owner: JAMESTOWN PREMIER GEORGETOWN PARK CORP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.