Building permit — retaining wall
In the Mount Pleasant Historic District The inspector failed my completed wall on 10/6/25 because he read the drawings to specify horizontal rebar in the side wall. The engineer said the inspector misinterpreted the plans. He has revised the drawings to clarify that no horizontal rebar was needed, only truss mesh. He has also revised the wall height to 4' and revised the railing details to allow wood or vinyl. The engineer has also written a letter explaining these changes and stating that the wall was constructed correctly.
Applicant: KAISER, JOCELYN C · Owner: KAISER, JOCELYN C
Building permit — permit
Building permit — permit
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.