CHEVY CHASE, MD, 20815 · Montgomery County
Building permit — building residential permit
Interior work only, Remove interior finishes and non-load-bearing walls from the previously converted garage and restore the space to a code-compliant garage, including required fire separation, slab adjustments, and installation of an overhead garage door. Construct a new laundry room and full bathroom with associated plumbing, electrical, and ventilation work. Provide updated finishes and electrical improvements as needed. All work to comply with applicable building codes.
Building permit — building residential permit
Interior work only,Renovate existing 2nd floor primary bathroom. Construct new closets with non load-bearing walls.
The assessment source did not respond, so the property record could not be loaded. This says nothing about the property — only that we could not reach the source just now.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Filed” are permit APPLICATIONS — Montgomery County publishes an intake date and a declared valuation. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.