WASHINGTON, DC 20017 · DC — Ward 5
Building permit — plumbing and gas
Owner: DYN-O-MITE FINE HOMES UNLIMITED LLC
Building permit — mechanical
Owner: DYN-O-MITE FINE HOMES UNLIMITED LLC
Building permit — electrical
Owner: DYN-O-MITE FINE HOMES UNLIMITED LLC
Building permit — alteration and repair
1. DEMOLITION AND REMOVAL OF ALL EXISTING FLOORING AND SUB-FLOORING DOWN TO JOIST LEVEL. THOUGHT OUT THE ENTIRE HOUSE ON ALL LEVELS.2. INSTALL NEW FLOORING - INSTALL NEW LVP FLOORING & SHOE MOLDINGS ON THE 2ND FLOOR AND BASEMENT.3. FULL RENOVATIONS OF 3 BATHROOMS.4. ALL INTERIOR DOORS TO BE RESTORED AND REPAINTED.5. ALL INTERIOR STAIRS TO BE RESTORED AND REFINISHED.6. DEMOLITION AND REMOVAL OF EXISTING KITCHEN CABINETS.7. KITCHEN RENOVATION. (NEW CABINETS, COUNTERTOP, APPLIANCES, PLUMBING, ELECTRICAL)8. DRYWALL. (NEW & REPAIR THE EXISTING AS NECESSARY)9. INTERIOR PAINT THOUGH OUT THE ENTIRE HOUSE. (CEILINGS, WALLS, DOORS & TRIMS)10. INSTALL LVL BEAM AND WOOD POST ON FIRST FLOOR.
Applicant: NELSON, OLIVER · Owner: NELSON, ROMAINE
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.