WASHINGTON, DC 20057 · DC — Ward 2
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — alteration and repair
CFA / H THIS SUBMISSION IS A PERMIT REVISION TO B2308341. THE REVISION UPDATES THE DESIGN TO REFLECT UPDATED ROUTING FOR HOT WATER, CHILLED WATER AND DOMESTIC HOT WATER PIPING.
Applicant: LILLY HOCHHAUSER · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
HISTORIC/CFA REVISION #1 TO B2510005 - RENOVATION TO CONFERENCE CENTER BAR, RESTAURANT AND BACK OF THE HOUSE KITCHEN. NET ZERO COST CHANGE DUE TO VALUE ENGINEERING IN PERMIT REVISION SCOPE. NO CHANGE IN USE OR OCCUPANCY.
Applicant: JOPATRIC LOVE · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
HISTORIC/CFA REVISION #1 TO B2509709 - ALTERATIONS OF LEVELS 1 THRU 5 OF PUBLIC AREAS AND GUESTROOMS FLOORS. VALUE ENGINEERING MODIFICATIONS. NET ZERO COST CHANGE DUE TO VALUE ENGINEERING IN PERMIT REVISION SCOPE. NO CHANGE IN USE OR LOAD.
Applicant: JOPATRIC LOVE · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — mechanical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
Georgetown University CFA McNeir Auditorium Renovation - Interior renovation of McNeir Hall, restore windows, new interior storm windows, new MEP, Fire Protection systems and interior finishes. No Change in Use for current COO B151335, but a new COO will be obtained for clarification of floors and square footage at the end of the renovation.
Applicant: JOPATRIC LOVE · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — miscellaneous
CFA / H Removal of one (1) 120-gallon aboveground storage tank (AST)
Applicant: CARI FINCH · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
HISTORIC & CFA Revision to Permit B2508166: Remove and replace generator at Georgetown University - New Research Building. Georgetown is removing the FRP reinforcement and carbon fiber rods requirement from the previous SOW.
Applicant: JESSE TARR · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
Georgetown Historic District Replacement of building sprinkler system with upgraded sprinkler valves and boxes, replacement of existing sprinkler heads, and installation of 2-hour fire-rated wall enclosures and hatches on the first, second, third, and fourth floors. Minor repair to finishes to support upgrade. Area affected: 13803 SF
Applicant: DFM PERMITS; CORENIC CONSTRUCTION GROUP LLC · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — alteration and repair
CFA / H Application to Amend Previously Issued Permit B2504197. Provide structural evaluation and reinforcement design for the existing foundation wall in Henle E, where multiple new and existing utility cores have resulted in cut reinforcement per GPR findings. Work includes designing required wall strengthening around these penetrations and updating the interior utility room wall to function as a cantilevered retaining wall to support adjacent crawl space soil. All work follows the base structural calculation package issued September 12, 2025, including applicable codes, loading criteria, and geotechnical parameters.
Applicant: NNEKA SHELTON · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
CFA / H Revision to approved permit B2509001 Revised Electrical drawings for Installation of (3) 500-ton TRANE temporary Chillers and associated equipment located at 9703 Prospect St / Lot #9 parking lot The purpose of these chillers is to provide temporary chilled water to the Lauinger Library and Village A buildings during the chilled water piping and equipment renovations Time Frame: June 2026 through August 2027
Applicant: JESSE TARR · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — civil plans
CFA / H This is BCIV permit application. The Georgetown University proposed a site improvement with land disturbance area of less the 1,500 sq.ft but greater than 50 sq.ft. The site improvement area is called Red Square Seating. The proposed work includes the reconfiguration of the existing courtyard into a circular seat wall feature centered around the existing tree.
Applicant: ADDISU WOLDESENBET · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — mechanical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
Interior alteration to 3,034SqFt on level 200 to include Demolition; Construction to include partitions, ceilings, lighting, electrical, structural, and finishes
Applicant: JOSEPH G. JARVIS (RAMCO) · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — na
Cottage Foods
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — elevator - alteration
HISTORIC & CFA Modernize 2 traction elevator in the Lauinger Library Building - new motors, new cab interior, new controller, new door equipment, new fixtures & other minor associated elevator equipment.
Applicant: N / A · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
THIS SUBMISSION IS A PERMIT REVISION TO B2307592. THE REVISION UPDATES THE DESIGN TO REFLECT ADDITIONAL PIPE REROUTING REQUIRED ONSITE WITHIN THE WALSH MECHANICAL ROOM. THE PROJECT INCLUDES REQUIRED MAINTENANCE AND UPGRADES TO GEORGETOWN UNIVERSITYS EXISTING MECHANICAL (HEATING AND COOLING) SYSTEM CONSISTENT WITH THE ORIGINAL PERMIT INTENT.
Applicant: LILLY HOCHHAUSER · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — permit
Building permit — plumbing and gas
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — mechanical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
Commission of Fine Arts jurisdiction area GEORGETOWN UNIVERSITY CONFERENCE CENTER RESTAURANT - PKG 2 SCOPE INCLUDES RENOVATION OF THE LEVEL 1 RESTAURANT/KITCHEN SPACE. FRAMING, MECHANICAL, ELECTRICAL, PLUMBING, FIRE, SPRINKLER, ENERGY/GREEN AND DOH-FOOD REVIEWS. INTERIOR ONLY. NO WATER FEATURES. THIS PERMIT IS ASSOCIATED WITH PACKAGE #1 B2509709 FOR THE GUESTROOMS IN THE SAME BUILDING.
Applicant: JOPATRIC LOVE · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
CFA & HISTORIC GEORGETOWN UNIVERSITY EDWARD B. BUNN S.J. INTERCULTURAL CENTER - ROOF REPLACEMENT INCLUDING Demolition of existing roofing systems. Installation of new roofing EPDM membrane, flashings, copings, and pavers at designated roofing areas.
Applicant: ADAM DYSON · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — permit
Building permit — sheeting and shoring
CFA & HISTORIC Due to the complexities of excavating around the existing utilities during the installation of the underground piping, RDC has decided to hire Berkel to design an Support of Excavation in this particular area of concern, Village A.
Applicant: JESSE TARR · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
Commission of Fine Arts jurisdiction area Installation of (2) 500-ton TRANE temporary Chillers and associated equipment located at 9703 Prospect St / Lot #9 parking lot. The purpose of these chillers is to provide temporary chilled water to the Lauinger Library and Village A buildings during the chilled water piping and equipment renovations Time Frame: October 2025 through October 2026
Applicant: JESSE TARR · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — alteration and repair
CFA / H Add exterior outlets for ambulance charging and add a new sub panel in the electrical room. Project is located at White-Gravenor Hall on the Georgetown University campus.
Applicant: MARCY GIANNUNZIO · Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Building permit — permit
Building permit — permit
Building permit — electrical
Owner: PRESIDENT & DIRECTORS OF GEORGETOWN UNIVERSITY
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.