WASHINGTON, DC 20015 · DC — Ward 3
Building permit — alteration and repair
Renovation of two existing hallway bathrooms located on the 2nd and 3rd floors, and a new laundry area, including replacement of plumbing fixtures, electrical fixtures, and associated non-structural framing modifications.
Applicant: LUIS HUANCA · Owner: MOOSAVI, MARJAN
Building permit — mechanical
Mechanical trade Permit
Applicant: KAMRAN GHAFFARI · Owner: KOOSHA, BAHMAN
Building permit — plumbing and gas
Owner: KOOSHA, BAHMAN
Building permit — electrical
Owner: KOOSHA, BAHMAN
Building permit — alteration and repair
The proposed work consists of interior alterations to an existing single-family dwelling, including renovation of the kitchen, conversion of an existing bathroom into a closet, construction of a new master bathroom, and installation of a laundry area within an existing storage room, all within the existing footprint.The scope includes new interior framing, installation of plumbing, electrical, and ventilation systems, as well as drywall, insulation, carpentry, and interior finishes. Kitchen improvements include installation of new cabinetry, countertops, fixtures, lighting, and associated systems.All work will be performed within the existing structure with no expansion to the building footprint.
Applicant: LUIS HUANCA · Owner: MOOSAVI, MARJAN
Building permit — demolition
The proposed work consists of interior selective demolition within an existing single-family dwelling, as shown on the demolition plans.Scope includes the removal of existing interior partitions, wall sections, finishes, cabinetry, and fixtures in designated areas. The work also includes the demolition of a portion of a load-bearing wall, as identified in the plans. Demolition will be limited to interior areas only and will occur within the existing building footprint. All demolition debris will be removed and disposed of in accordance with applicable regulations.
Applicant: LUIS HUANCA · Owner: KOOSHA, BAHMAN
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.