WASHINGTON, DC 20024 · DC — Ward 6
Building permit — electrical
Owner: MEPT / FCP PATRIOTS PLAZA LLC
Building permit — plumbing and gas
Owner: MEPT / FCP PATRIOTS PLAZA LLC
Building permit — alteration and repair
CFA / H THE PERMITTABLE SCOPE OF WORK INCLUDES MINOR ALTERATIONS TO THE EXISTING TENANT IMPROVEMENTS (REMOVAL OF INTERIOR PARTITIONS, REPLACEMENT OF THE PANTRY MILLWORK INCLUDING ASSOCIATED MECHANICAL, PLUMBING, AND ELECTRICAL WORK). THE PERMITTED AREA OF WORK IS LIMITED TO APPROXIMATELY 1,041 SQ. FT. OF WORK. THE REMAINING SCOPE OF NON-PERMITTABLE WORK IS FOR NEW FLOOR FINISHES AND PAINT EXISTING BUILDING EGRESS & FIRE RATING NOT CHANGED. THIRD FLOOR SQUARE FOOTAGE AFFECTED: BREAK RM 342 SQ. FT. BREAK RM 389 SQ. FT. TOTAL 731 SQ. FT. FOURTH FLOOR SQUARE FOOTAGE AFFECTED: BREAK RM 169 SQ. FT. BREAK RM 141 SQ. FT. TOTAL 310 SQ. FT. TOTAL SQUARE FOOTAGE AFFECTED THIRD & FOURTH FLOORS: 1,041 SQ. FT. REMAINING AREA OF WORK SHOWN FOR REFERENCE ONLY, PERMIT NOT REQUIRED FOR PAINT & CARPET SCOPE
Applicant: ANDREW ADERE · Owner: MEPT / FCP PATRIOTS PLAZA LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.