WASHINGTON, DC 20016 · DC — Ward 3
Building permit — variance
2017 DC Building Code (DCPC) Section 403 Plumbing Code Table 403.1 Minimum Number of Required Plumbing Fixtures (Please see attached Letter narrative below). Plans show group gender-neutral bathroom facilities in Pre-K thru 2nd grade classrooms and group restrooms 115T, 222T, and 324T. Current Plumbing Code does not accommodate this arrangement. The 2021 International Plumbing Code contains provisions applicable to this arrangement (Reference Sections 403.1.1, Exception 2, Section 403.2, Exception 6, and Section 405.3.4), though this is not yet adopted in this jurisdiction. As submitted, the current configuration and plumbing fixture calculations require a code modification.
Applicant: PERKIN EASTMAN · Owner: SIDWELL FRIENDS SCHOOL
Building permit — miscellaneous
Afterhours permit for work at 3825 Wisconsin Ave NW for Indigenous Peoples Day Holiday (10-12-2026) from 9AM-6PM. D2600344.Work Includes Interior demo, scanning of interior of building, earthwork for their schedule to be met. ANC Support letter included with this application.
Applicant: DFM PERMITS · Owner: SIDWELL FRIENDS SCHOOL
Building permit — excavation only
Historic- Erosion and sediment control for demolition phase of project. No wet utility work is proposed under this permit. Separate interior demo permit is in process D2600344.
Applicant: DFM PERMITS · Owner: SIDWELL FRIENDS SCHOOL
Building permit — plumbing and gas
Owner: SIDWELL FRIENDS SCHOOL
Building permit — demolition
Interior Demolition of Harrison Building.
Applicant: DFM PERMITS · Owner: SIDWELL FRIENDS SCHOOL
Building permit — plumbing and gas
Owner: SIDWELL FRIENDS SCHOOL
Building permit — plumbing and gas
Owner: SIDWELL FRIENDS SCHOOL
Building permit — plumbing and gas
Owner: SIDWELL FRIENDS SCHOOL
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.