WASHINGTON, DC 20007 · DC — Ward 3
Building permit — alteration and repair
Removal of both non-load bearing and load bearing partition walls. Installation of new beams and posts. New powder room at first floor. Renovation to existing second floor bathroom and new full bathroom at second floor. New electric dryer, recessed lights and car charger. Electrical service upgrade from 200 amps to 400 amps.
Applicant: EMILY HIRST · Owner: PAULSON, ELIZABETH M
Building permit — plumbing and gas
Owner: BLACKLEDGE, VALENTINA F
Building permit — electrical
Owner: BLACKLEDGE, VALENTINA F
Building permit — alteration and repair
REMOVAL OF SELECT NON-STRUCTURAL PARTITION WALLS. NEW NON-STRUCTURAL PARTITION WALLS and finishes. BATHROOM REPLACEMENT IN-PLACE, IN-KIND. KITCHEN CABINETS, REFRIGERATOR AND SINK REPLACED. GAS RANGE REMOVED. GAS LINE CAPPED BEHIND WALL OR CEILING.
Applicant: JEFF CHOWN · Owner: CHRISTOPHER BLACKLEDGE
Building permit — building
Applicant: VALENTINA BLACKLEDGE · Owner: BLACKLEDGE, VALENTINA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.