WASHINGTON, DC 20007 · DC — Ward 3
Building permit — miscellaneous
Work will be confined to the active construction areas and will consist of asphalt paving installation, interior plumbing piping and rough-in within the building, and finishing, electrical installation, and interior carpentry finish work. All activities will be performed between 7:00 AM and 5:00 PM
Applicant: LEONARDO GALVAO · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Work will be confined to the active construction areas and will consist of asphalt paving installation, interior plumbing piping and rough-in within the building, concrete placement and finishing, electrical installation, and interior carpentry finish work. All activities will be performed between 7:00 AM and 5:00 PM
Applicant: LEONARDO GALVAO · Owner: DISTRICT OF COLUMBIA
Building permit — elevator - new
INSTALL 1 NEW ELEVATOR - 3500lbs @ 100FPM
Applicant: N / A · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Scope of work includes the cafeteria addition, consisting of new masonry wall construction, application of interior finishes, and selective interior demolition of existing structures.
Applicant: LEONARDO GALVAO · Owner: DISTRICT OF COLUMBIA
Building permit — alteration and repair
Revision to Permit # B2501823 to allow for *** ELEVATOR REVIEW ONLY *** No changes proposed to previously approved drawings.
Applicant: DFM PERMITS · Owner: DISTRICT OF COLUMBIA
Building permit — plumbing and gas
Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Work to be performed on President's Day includes the erection and placement of structural steel along with the installation of mechanical, electrical, and plumbing systems within the building interior. Additional activities scheduled for this period include carpentry work on the garage soffit, waterproofing applications, and ongoing plumbing and electrical installations. All work will be conducted in strict accordance with approved plans and applicable building codes. Authorized work hours for this holiday period are from 7:00 AM to 3:00 PM.
Applicant: LEONARDO GALVAO · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
After-hours work to include erection and placement of structural steel and installation of mechanical, electrical, and plumbing systems within the building interior. All work will be performed in accordance with approved plans and applicable codes. Work hours are from 7:00 AM to 3:00 PM.
Applicant: LEONARDO GALVAO · Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.