WASHINGTON, DC 20019 · DC — Ward 7
Building permit — fence
INSTALL FENCE W/ GATE
Applicant: MICHELLE CLANCY · Owner: WARD, M E
Building permit — solar system
RESIDENTIAL GRID ROOF MOUNTED INTERACTIVE SOLAR INSTALLATION System AC Size @ STC: 5.76 kW System DC Size @ STC: 7.820 kW (17) JINKO SOLAR TIGER NEO JKM460N-48HL4M-DB-Z1-EN SOLAR MODULES (1) SOLAREDGE SE5700H-USSKBEZ8 HOME HUB SINGLE SKU (240V) W/INTEGRAL CERTIFIED RGM
Applicant: NICK HAYES · Owner: WARD, MARY
Building permit — electrical
Owner: WARD, MARY
Building permit — solar system
Rooftop solar installation 26 415w panels. Roof repair or replacement as needed
Applicant: MATTHEW YOUNG · Owner: WARD, M E
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.