WASHINGTON, DC 20002 · DC — Ward 6
Building permit — alteration and repair
REVISION FOR PERMIT NUMBER B2602708CONSTRUCT A ROOF TOP DECK, PARKING PAD AND WOOD FENCE.
Applicant: 421 4TH ST LLC · Owner: 421 4TH ST LLC
Building permit — alteration and repair
REVISION FOR PERMIT NUMBER B2602708DEMO PLAN REVISION:SEE EXISTING FLOOR PLAN /WALLS TO BE REMOVED/ AND PROPOSED FLOOR PLAN /NEW WALLS/. (REVISED AS LEGEND)
Applicant: 421 4TH ST LLC · Owner: 421 4TH ST LLC
Building permit — electrical
Owner: 421 4TH ST LLC
Building permit — mechanical
Owner: 421 4TH ST LLC
Building permit — plumbing and gas
Owner: 421 4TH ST LLC
Building permit — alteration and repair
INTERIOR RENOVATION:CONVERSION FROM RESIDENTIAL TWO FLATS TO A RESIDENTIAL ROW SINGLE FAMILY; KITCHEN AND BATHROOM REMODELING, FRAMING, DRYWALL, TRIM, PAINTING, FLOORING, REPLACE INTERIOR DOORS, REPAIR/REPLACE/SISTER DAMAGED JOISTS AS NEEDED, INSTALL HEADERS, REPLACE EXISTING 4 INCH SLAB, MECHANICAL, ELECTRICAL, REPLACE PLUMBING FIXTURES IN KIND.
Applicant: ZUBAIR KHAN · Owner: 421 4TH ST LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.