WASHINGTON, DC 20016 · DC — Ward 3
Building permit — mechanical
Mechanical trade Permit
Applicant: RICHARD MINESINGER · Owner: STEWART, GORDON B
Building permit — electrical
Owner: STEWART, GORDON B
Building permit — plumbing and gas
Owner: STEWART, ALEXANDRA A
Building permit — addition alteration repair
REMOVE AND REPLACE EXISTING REAR ADDITION. NEW FULL WIDTHREAR ADDITION OVER CONDITIONED CRAWLSPACE; PARTIALSECOND FLOOR ADDITION. ENCLOSE GARAGE & PROVIDE PARKINGPAD AT GRADE. NEW ELECTRICAL & HVAC THROUGHOUT. ZONING APPROVAL is subject to the following CONDITIONS: - Either the principal dwelling or accessory apartment unit shall be owner-occupied for the duration of the accessory apartment use. - Prior to renting an accessory apartment in any zone, the property owner shall obtain a Residential Rental Business License from DLCP and the property shall be inspected for relevant housing code compliance. - REQUIRED INSPECTION: An inspection is required to verify the REQUIRED OFF-STREET PARKING SPACE has been provided per submitted plans.
Applicant: BETH DAVIS · Owner: STEWART, ALEXANDRA A
Building permit — building
Applicant: BETH DAVIS ON BEHALF OF · Owner: STEWART, GORDON B
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.