WASHINGTON, DC 20016 · DC — Ward 3
Building permit — alteration and repair
SELECTIVE EXTERIOR DEMOLITION OF PORTIONS OF EXISTING EXTERIOR WALLS OF AN EXISTING BUILDING
Applicant: SABRINA NAGEL · Owner: NESSO PLAZA TENLEYTOWN LLC
Building permit — demolition
SELECTIVE INTERIOR DEMOLITION OF INTERIOR PARTITIONS THAT ARE NOT STRUCTURALLY LOAD BEARING. REMOVE ALL WALL COVERINGS AND MEPs
Applicant: SABRINA NAGEL · Owner: NESSO PLAZA TENLEYTOWN LLC
Building permit — miscellaneous
Advancement of three (3) soil borings for environmental assessment
Applicant: CARI FINCH · Owner: PNC BANK NATIONAL ASSOCIATION
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.