WASHINGTON, DC 20032 · DC — Ward 6
Building permit — electrical
Owner: DECENA, WANKAIRYS
Building permit — demolition
Selective interior demolition in preparation for renovation. Remove the existing non-load-bearing partition between the first-floor kitchen and dining area; demolish the existing second-floor bathroom down to the substrate; clear existing basement partitions and finishes for the revised layout; and remove existing kitchen finishes. Selective opening of first-floor exterior wall sections for insulation. No load-bearing or structural elements were removed; the roof and exterior walls remain; the building is not being razed. All debris was removed and legally disposed of.
Applicant: CHRISTIAN DAUPHIN · Owner: DECENA, WANKAIRYS
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.