WASHINGTON, DC 20002 · DC — Ward 5
Building permit — alteration and repair
At the most recent inspection for work performed per my permit B2507090, the Inspector directed that revised plans be DOB-filed (i) to add flashing (despite not being in DOB-approved plans); and (ii) to show the different material used for one component than what the approved structural plans specified. Submitted with this application are revised plans with clouds around the changes.
Applicant: NEUMAN, DAVID A · Owner: NEUMAN, DAVID A
Building permit — alteration and repair
Build deck slightly larger than existing - see BZA-issued variance included as supporting document. Replace parking pad and build stairs between parking pad and deck. Add awning to cover deck. Demolition Permit D2500352 previously issued 6/6/25 - included as supporting document. $6000 cost here for the awning parts and labor. $11,000 cost here is for parking pad labor and materials; $23,000 cost for labor and materials for deck and stairs is provided.
Applicant: NEUMAN, DAVID A · Owner: NEUMAN, DAVID A
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.