WASHINGTON, DC 20011 · DC — Ward 4
Building permit — electrical
Owner: DISTRICT OF COLUMBIA
Building permit — mechanical
Owner: DISTRICT OF COLUMBIA
Building permit — boiler
Owner: DISTRICT OF COLUMBIA
Building permit — plumbing and gas
Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
After Hours Work on Juneteenth (June 19), and Independence Day (July 3)
Applicant: MANDY LEUNG · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
After Hours Work on Memorial Day (May 25).
Applicant: MANDY LEUNG · Owner: DISTRICT OF COLUMBIA
Building permit — miscellaneous
Request for after-hours work on Thursday, April 16, 2026, in observance of Emancipation Day. Issued permit scope: Elementary school, program to include twelve classrooms, sped office, teacher collab, and new entry vestibules Existing school not in scope other than to tie-in to addition and systems connections Existing trailers on site to be removed after completion of addition Refer to landscape and civil drawings for site scope of work.
Applicant: MANDY LEUNG · Owner: DISTRICT OF COLUMBIA
Building permit — electrical
Owner: DISTRICT OF COLUMBIA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.