WASHINGTON, DC 20017 · DC — Ward 5
Building permit — electrical
Owner: THE CORPORATION OF THE WASHINGTON LATIN SCHOOL
Building permit — alteration and repair
The scope of work for this project consists of providing an FACP panel replacement due to a malfunctioning panel. The existing Notifier AFP-200 FACP is obsolete and will be replaced with a new Notifier N16E panel. In addition, a new Honeywell CLSS Gateway Cellular Dialer will be provided - adjacent to the new FACP - to replace the existing dialer. This FACP replacement will also necessitate the replacement of the lamp driver modules in the two graphic annunciators as well as all field ionization detectors (replaced with photoelectric detectors) as the existing devices are not compatible with the new FACP. No new connections will be added to the system and the existing building sequence of operations shall be maintained.
Applicant: KEITH JOHNSON · Owner: THE CORPORATION OF THE WASHINGTON LATIN SCHOOL
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.