WASHINGTON, DC 20032 · DC — Ward 8
Building permit — alteration and repair
Interior renovation and repair for an existing 5 units building. -To replace damaged interior wall studs in place. To replace floor finish and interior wall coverings in kind. To replace kitchen cabinets in place. To replace windows and doors in place. -To replace bathroom fixtures and damaged plumbing pipes. -To replace mechanical HVAC units and ductworks. -To replace electrical fixtures, receptacles and wirings. No change of the interior layout.
Applicant: DAGMAWI GEBREKIDAN · Owner: QUARA PROPERTIES LLC
Building permit — mechanical
Mechanical trade Permit
Applicant: EPHREM GEBRESELASSIE · Owner: QUARA PROPERTIES LLC
Building permit — electrical
Owner: QUARA PROPERTIES LLC
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.