WASHINGTON, DC 20016 · DC — Ward 3
Building permit — alteration and repair
A. Interior Wood Replacement (Non-Structural) Carefully remove damaged or deteriorated interior wood trim and framing, limited to non-load bearing studs, nailers, and furring strips as necessary. Replace with standard dimensional lumber (e.g. 2x4, 2x6) per existing layout. All replacement to match existing layout; no change in room dimensions or layout. B. Drywall Replacement Remove and replace up to 800 sq ft] of interior drywall due to wear, water damage, or for aesthetic upgrade. Installation of 1/2" or 5/8 gypsum wallboard (as appropriate per code) on walls and ceilings. Tape, mud, and sand joints smooth for paint-ready finish. No changes to room configuration, fire-rated assemblies, or egress. C. Window Replacement Remove and replace up to 6 existing window units with energy-efficient, code-compliant vinyl or aluminum-clad windows. Replacement units will fit into existing rough openings with no structural modifications to framing. All new windows will match existing size and style; no change in window type or location. Installation will meet DC energy and safety codes, including tempered glass if required by location. Repair interior drain title 90 FT free FLO Drain and One Sump Pump
Applicant: ROBERT SIMMONS · Owner: 4317 RIVER ROAD LLC
Building permit — plumbing and gas
Owner: 4317 RIVER ROAD LLC
Building permit — building
Applicant: ROBERT SIMMONS · Owner: RSR TRUST
Building permit — building
Applicant: ISABELLA MICHAELS · Owner: RSR TRUST
Building permit — building
Applicant: ROBERT SIMMONS · Owner: RSR TRUST
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.