WASHINGTON, DC 20016 · DC — Ward 3
Building permit — alteration and repair
Partial underpinning of existing basement wall foundations
Applicant: ALI SHAKERI · Owner: LERUM, ELYSE K
Building permit — addition alteration repair
NEW 2-STORY REAR AND BASEMENT ADDITION, NEW KITCHEN AND FAMILY ROOM, MODIFIED POWDER ROOM, MODIFIED FRONT PORCH ON PIERS, NEW STAIR TO BASEMENT AND 2ND FL, REPLACE 2ND FLOOR ROOF AND FLOOR. NEW PRIMARY SUITE, RELOCATED 2ND FL HALL BATH, NEW ATTIC, NEW ELECTRICAL AND LIGHTING, NEW ELECTRICAL HEAVY-UP TO 200 AMP, NEW PLUMBING, NEW AND REPLACEMENT HVAC, NEW SMOKE AND CO DETECTORS, NEW REAR WOOD DECK, INTERIOR MODIFICATIONS. PARTIAL BASEMENT UNDERPIN (SEE SEPARATE PERMIT), NEW CONC PARKING PAD AND PERVIOUS STEPPING STONES.
Applicant: BRENDA PFEIFFER · Owner: LERUM, ELYSE K
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.