WASHINGTON, DC 20007 · DC — Ward 3
Building permit — fence
HISTORIC Installation of 83' of 6' highcedar solid board fencing with tow 4' wide gates
Applicant: LOUISE MACKENZIE · Owner: BARTH, PETRA
Building permit — electrical
Owner: BARTH, PETRA
Building permit — plumbing and gas
Owner: BARTH, PETRA
Building permit — electrical
Owner: BARTH, PETRA
Building permit — electrical
Owner: BARTH, PETRA
Building permit — mechanical
Owner: BARTH, PETRA
Building permit — alteration and repair
HISTORIC Basement - Floor tile, HVAC, demolish bathroom (HVAC, plumbing and electrical upgrade), and interior trims demolition.Main Floor - Demolish kitchen and bathroom, HVAC, plumbing and electrical upgrade.Second Floor - Demolish non-bearing wall, alteration to include a new hallway, bathroom and bedroom, HVAC, plumbing and electrical upgrade.Attic - Demolish non-bearing wall
Applicant: VICTOR CABIDO · Owner: ANAND, ROHINI
Building permit — alteration and repair
Replacing 30 windows and 1 door
Applicant: JENNIFER GOON · Owner: BARTH, PETRA
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.