WASHINGTON, DC 20008 · DC — Ward 3
Building permit — alteration and repair
***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator #1-3 mainline disconnects, Replace the 110v cab light disconnects, Replace lights and GFIs in EMR and Pit, Install (2) sump pumps.
Applicant: SAMUEL HARBAGE · Owner: ALBEMARLE JV SPE LLC
Building permit — alteration and repair
Level 2 Type Alteration to existing Apartment Building Lobby, work Area is approximately 1200 square feet. Replace in kind existing Storefront and add new vestibule with associated Structure and MEP. Re-Clad underside of existing canopy and replace lights. New HVAC with associated Electrical. New Package Room. Add Wheelchair Lift for 24" height of corridor above lobby.
Applicant: PATRICIA J STAUB · Owner: ALBEMARLE JV SPE LLC
Building permit — plumbing and gas
Owner: ALBEMARLE JV SPE LLC
Building permit — sign
Replace in Kind Sign Panel only of Monumental Sign to correct text from "AVALON" to "The Albemarle" on existing sign.
Applicant: PATRICIA STAUB · Owner: ALBEMARLE JV SPE LLC
Building permit — boiler
Owner: ALBEMARLE JV SPE LLC
Building permit — gas fitting
Owner: SMITH PROPERTY HOLDINGS FIVE LP
Building permit — mechanical
Owner: SMITH PROPERTY HOLDINGS FIVE LP
Published by the District as assessment data, separately from the permit record above, and current as of the District’s own assessment cycle rather than today. An assessment can lag construction by a cycle, so a property with a recently issued permit may still be assessed as it was before the work. Owner details are published by the jurisdiction but are deliberately not shown here.
These are the permits published by the jurisdictions listed above. A project usually depends on approvals from other agencies that publish nothing machine-readable — a forest conservation exemption, a well completion report, a sediment control or grading plan, a utility connection, a homeowners’ association sign-off. Their absence here is not evidence they were not required, and the gaps between the dates above are usually where they happened. Rows labelled “Issued” are ISSUED permits — Washington DC publishes an issue date and no project valuation at all. Records are grouped by normalised address text, so the same property may also appear upstream under a different spelling. Verify scope, dates, and contractor information with the issuing jurisdiction before bidding, quoting, or performing work.